Page 11 - Demo
P. 11


                                    What's the Crew Up To:Subtransmission Line Rebuild in Lancaster CountyNorris Public Power District crews are currently working on a subtransmission line rebuild near the Raymond Central School in Lancaster County. The construction begins at the Agnew substation going south on private right-of-way, following the existing route connecting with the subtransmission line along Branched Oak Road. The previous line had been in place for many years, and like all equipment, it had reached the end of its life. With an approximate value of $665,500, this project represents an important investment that Norris makes to maintain and ensure the long-term stability of its electric system.The 3.5-mile construction project includes the installation of approximately 60 poles. This rebuild also features the use of twisted pair conductor (wire), which is designed to carry more load capacity and reduce the risk of ice buildup and galloping during severe winter weather. These upgrades provide long-term benefits by creating a stronger, more resilient system for the homes, farms, and businesses Norris serves.Right-of-Way Operator Braden Nowka removes trees in preparation of the new line construction.This map outlines the north%u2013south route of the subtransmission line rebuild project, from the Agnew substation in section 9 to the existing subtransmission line along Branched Oak Road in section 28.New poles delivered and ready for installation as crews begin the 3.5-mile line rebuild.NOVEMBER/DECEMBER 2025ENERGY EDUCATION 11
                                
   5   6   7   8   9   10   11   12   13   14   15